Azerbaijan tracks steady progress on Horadiz-Jabrayil-Zangilan-Aghband Highway

Azerbaijan tracks steady progress on Horadiz-Jabrayil-Zangilan-Aghband Highway
фото показано с : trend.az

2025-9-16 19:53

The 123.6 km Horadiz-Jabrayil-Zangilan-Aghband highway is 95 percent complete, with a total project length of 149.9 km. The road features 4 to 6 lanes, a width of 14-21 meters, and includes 28 bridges and 3 tunnels totaling over 12 km. So far, 950,000 m

Подробнее читайте на ...

azerbaijan tracks steady progress highway